OS X V10.6 Snow Leopard :: Change Order Of Left Hand List In Mail?
Jun 14, 2012
Having now added a GMail IMAP account to Mail, I find that it's folders come at the bottom of the window, with 'Mailboxes', 'Trash', 'Reminders', 'On My MAc', RSS above the GMail Top level mailbox and therfore the subsequent cascaded mailboxes...
View 1 Replies
ADVERTISEMENT
Apr 12, 2012
Many records in my address book have multiple email addresses. No big deal but I wonder if there is a way to tell Address Book / Mail which address to pick as the default.
For example I send a litttle news email one a week to a group of contacts. I want to send this email to people's personal -- not business -- email address. I've created a group in Address Book and type that group name in my Mail to line and the group pops up. But a few of the records pick the corporate address and I have to go in and change those addresses.
I just tried editing one record ... I deleted both "work" and "home" addresses from a record. Then reentered them "home" first, "work" second. But when I closed the edit Address Book listed them in the original order (maybe alpha).
Info:
iMac 21 1/2, Mac OS X (10.6.8)
View 2 Replies
View Related
Apr 30, 2012
how to change the page order in Microsoft word 2008?
View 1 Replies
View Related
Jun 25, 2012
In Mail, is there a way to print the list of mail activity in a folder without actually printing each email?
View 2 Replies
View Related
Sep 6, 2014
I have a LOT of rules in Mail. For example, one of my clients has about 10 different project managers and I filter messages from each PM into a separate folder. Occasionally I need to make changes to these rules but they only display in the order in which I created them, which is a PITA. Is there any way of changing the list order, e.g. by name etc.?
Info:
MacBook Pro, OS X Mavericks (10.9.4), Mac user since 1995- also MacMini
View 2 Replies
View Related
May 16, 2012
What does the flag in the left of Apple mail mean?
Info:
MacBook Pro, Mac OS X (10.6.8)
View 5 Replies
View Related
May 1, 2012
I have a home business with a couple of hundred customers. I'd like to maintain a mailing list so I can contact them all en masse occasionally, whenever there's something that might be of interest to them. What's the best way to do this? Can I build a mailshot list within Mail? Or should I keep the list separately somewhere and paste the addresses into my mailshot?
Info:Mac Mini, Mac OS X (10.6.2)
View 7 Replies
View Related
Mar 24, 2012
When I try to change the settings for my Mail app, in Snow Leopard, the incoming mail settings are greyed out. What do I do to be able to change these?
(I had a problem, with my Mail account, which a consultant fixed for me on my laptop. But I cannot remember what he did to access the incoming mail server preferences, and make the changes, because on my desktop these are still greyed out.)
Info:
MacPro, MacBook Pro, ipods, Mac OS X (10.6.2)
View 1 Replies
View Related
Feb 23, 2012
Can I change the Mail's language without changing OS X language?
View 1 Replies
View Related
Apr 9, 2012
I have been trying to send som JPEG files to a client. These files are no more than 450 kb. They were made in Adobe Illustrator CS5. The file sizes on my Mac are below 450 kb, yet when I attach them to an e-mail the size plummets to 31.3 kb, making them totally unusable for my client. I do not see any setting in Mail that would affect the file size of an attachment. I've attached files before with no problem. I do not know if this is because it's a JPEG. Unfortunately JPEG is the file format that they need. So to get arounfd this I've uploaded them to my server... but it would be so much easier to just be able to attach them to an e-mail.
Info:
iMac, Mac OS X (10.6.8)
View 4 Replies
View Related
Dec 14, 2008
I'm just curious as to how many people use mice in their left hand. I was looking at some old macintosh pictures and a lot of them have the mouse on the 'other' side. I'm left handed, yet I have grown up with right handed mice and it feels awkward to use a mouse in my left hand now. Does anyone out there use mice in their left hand, or has everyone conformed to a right handed world?
View 16 Replies
View Related
Mar 28, 2012
I can't change 'Incoming Mail Server' which is a grey [URL]
Info:
MacBook, Mac OS X (10.7.3), Mail 5.2
View 3 Replies
View Related
Jun 1, 2012
A couple weeks back, we switched from exchange 2007 to exchange 2010.The only change required on the OSX mail client was to change the server address.I have two macbook pros, one is a 2GB early vintage intel, and the other a more recent 4GB model.Both of them are configured for access to the exchange server.Both are running 10.6.Once the change was made, both clients started using huge amounts of memory.This isn't a leak, as is reported in some Lion threads, because it eventually comes back down again.When you start the client, it might use about 150MB of RAM.After a while I have seen as much as 1.6GB of RAM usage on the 4GB machine.If you take the exchange account out of the mix (disable it in preferences) the client consistently stays at about 75MB of RAM.The peak isn't limited by the client as far as I can tell -- it basically uses up all free memory and drives the system completly nuts.Many of the applications no longer perform well once they are subjected to memory starvation, and this includes the mail client itself.
I am now running the activity window with Mail to see if I can spot a pattern, but in one case I watched Mail's memory usage grow in Activity Monitor with nothing in the Activity screen.I aso tried creating a new account instance on the 4GB machine, but without any cached data the behavior was far worse.It very quickly consumes the entire machine and doesn't seem to return to normal.I am firmly convinced this is a side effect of changing the exchange service or one of the exchange settings, if for no other reason than the behavior is new on two systems.It's still unforgivable for the Mail client to do this -- if it can consume all available memory then it needs to monitor itself and defer or break up what it is trying to do.I am a great fan of this mail client but this is so unusable that it might force me back to outlook running in a VM.
Info:
MacBook Pro, Mac OS X (10.6.8)
View 4 Replies
View Related
Feb 18, 2009
I have seen some desktops with their bottom dock but in the style of the left dock. I'm desperately looking for the left hand style dock on the bottom. I have CandyBar but it is only the trial.
View 12 Replies
View Related
Feb 2, 2012
Is it possible to draw a map free hand with any Apple software product? I would like to include a color map of a public garden that I am building an iWeb website for.
Info:MacBookPro, Mac OS X (10.6.8)
View 2 Replies
View Related
May 2, 2012
My Air book just won't unfreeze
I have tried rebooting sevral times but then nothing happens, cursor still remains frozen in left hand corner I tried starting whiling holding shift key but screen went pink and no safe mode came up
View 5 Replies
View Related
Jun 24, 2012
Can I move the trash bin from the right hand side to the left.
Info:
iMac, Windows 7
View 8 Replies
View Related
Jun 26, 2014
Aperture shows no adjustments from the left-hand panel, not WB, not exposure, contrast, color, nada. I can crop, rotate, clone, straighten, take out the red-eye, but that's it.
View 3 Replies
View Related
Feb 9, 2010
I was just dragging some items around the desktop into some folders in the Finder and I guess something got messed up. When I was finished moving things around, a small square icon appeared in the left hand corner of the screen that cannot be dragged to another location or deleted. Whenever I click, it a small screen pops up momentarily, saying that it's going to open a file (I deleted the file) and nothing happens. After I deleted the file, the small square box just contains a picture of a question mark. I'm trying to get rid of it, but I don't know how to.
View 5 Replies
View Related
Apr 14, 2012
I cannot open the links on the left-hand side on this page.[URL] On the bottom left I see the word javascript but I have checked and JavaScript is loaded?
Info:
Mac mini, Mac OS X (10.7.3)
View 7 Replies
View Related
Dec 5, 2010
I've had this iMac about a year now, and i have had this problem for a while but thought i'de leave it for abit and see if it heals its self. As sometimes the line is more visible than other times and sometimes it's not even there!
I have 2 pictures which i snapped with my iPhone, so i will link you too them.
The line is not majorly visible, but it is just annoying considering i payed �1000 for this iMac.
Picture1: Line overlapping my iTunes.
[URL]
Picture2: Line on boot up.
[URL]
View 1 Replies
View Related
Jul 5, 2012
what does it mean to have green line on your screen?
View 1 Replies
View Related
Dec 4, 2014
I want to print iCal with Mondays in the left hand side column. My calendar prints with Tuesday in the left hand column even though it displays Mondays in the left hand column when in normal use.
Info:
iMac, OS X Yosemite (10.10.1)
View 2 Replies
View Related
Jun 5, 2014
The bottom left hand quadrant of my screen has dimmed. Apple repaired this a year ago and the problem is back. My Applecare is expiring soon. What are my options?
Info:
MacBook, Was working
View 1 Replies
View Related
Feb 25, 2012
Please advise how i restore the icons in the top left hand corner of safari that enable me to reduce, delete etc?
Info:
iMac (21.5-inch Mid 2011), Mac OS X (10.7.3)
View 5 Replies
View Related
May 11, 2012
I'm trying to use iphoto but when I put my cursor over a photo it has a small flag in the upper left hand corner and a downward arrow in the lower right corner.I've used it lots but it just started doing this. My events pull up just not a single photo.
Info:
iPhoto '11, iOS 5.1.1
View 1 Replies
View Related
Sep 11, 2010
I have only recently started noticing this, it is mostly visible on the white screen at boot up but just faintly noticed it now against my background.
It is a fading black line going down the left hand side of the screen, it starts at the top kind of fades in the middle then comes out again.
I honestly have no idea what this is, i will try catch a picture on my phone soon and post it up.
Cheers.
UPDATE: Sometimes the line is clear, sometimes it is faint and even sometimes it isn't even there!
View 2 Replies
View Related
Apr 1, 2009
What are the little widgety things under our usernames to the left hand side of the message windows? Why are they labelled "Rule '1'" and similar? When did they appear? I'm sure they weren't there last time I logged in...
View 2 Replies
View Related
Jul 22, 2010
how to re-assign the order of Spaces (not the contents) under Snow Leopard? perhaps a third party utility?
View 7 Replies
View Related
Mar 11, 2012
I would like to sort these folders in some kind of alphabetical order. i see that I can order these manually (not convenient) and I am not finding a good option in the View pulldown.
View 8 Replies
View Related